Cuadrilla Fracking Site thumbnail

Fracking site in Lancashire has second tremor in 24 hours

Published: 11:02, October 28, 2018

A fracking site in Lancashire has recorded a second earth tremor in 24 hours. The two tremors have occurred just eleven days after the fracking site got the go ahead.

The fracking site, at Preston New Road in Lancashire, is the only active fracking site in the United Kingdom.

When Cuadrilla Resources detected the first quake – a 0.76 magnitude tremor – it suspended all operations. The Lancashire-based company said it expected to resume work on Sunday (today).

The oil and gas exploration company described the earth movement as a ‘micro seismic event.’ In other words, it described it as a super-tiny earth tremor.

Fracking site – one red event

Any tremor above 0.5 magnitude is a ‘red event‘ or ‘red incident.’ When there is a red event, the fracking site has to stop operations. In other words, the fracking company must stop injecting water and monitor the site for further seismic activity.

Since the fracking site came into operation on 15th October 2018, it has registered eighteen earth tremors. However, only one of them was a red event.

Fracking site earth tremors Lancashire
Cuadrilla has registered two tremors in 24 hours at its fracking site in Lancashire. (Image: adapted from cuadrillaresources.com)

A spokesperson for Cuadrilla Resources said:

“This is not a ‘red’ incident under the traffic light system operated by the Oil and Gas Authority as we were not pumping fracturing liquid as part of our hydraulic fracturing operations at the time.”

“However, we will, as always, continue to monitor the seismic activity closely and plan to resume hydraulic fracturing on Monday.”

Fracking site – work suspended for 18 hours

The 0.70 magnitude tremor on Saturday (yesterday), was a red event. On Saturday, Cuadrilla made the following statement in a press release:

“Cuadrilla was hydraulically fracturing the shale rock adjacent to a horizontal well at the time and the seismicity is classed as a red event in line with the traffic light monitoring system regulated by the Oil and Gas Authority (OGA).”

“Operations have now paused for the next 18 hours during which seismicity levels will continue to be measured. The British Geological Survey (BGS) records seismicity to one decimal place and therefore have recorded the event as 0.8ML (local magnitude).”

Micro seismic events harmless

Cuadrilla says that such micro seismic events do not cause any damage or harm on the surface. They are micro earth movements that happen below ground. Humans on the surface cannot feel them.

Previous earth tremors in Lancashire

This fracking site is not the only one to register earth tremors in Lancashire. In 2011, a 1.5 magnitude tremor brought all activity to a halt on the Fylde Coast. It was the second quake in two months.

The current fracking site is the first fracking activity to occur in the UK since 2011.

Christian Nordqvist Avatar

Other News

Proofpoint agrees to buy Varonis in $6.3 billion data security deal

Oct 16, 2026

EU tourist accommodation records 3.14 billion nights in 2025

Oct 16, 2026

Travelers profit edges higher as investment income sets a record

Oct 16, 2026

Euro-area inflation reaches 3.8% as energy pressure intensifies

Oct 16, 2026

UK regulator proposes new oversight of Microsoft business software

Oct 16, 2026

US industrial output rises 0.7% as utilities outpace factories

Oct 16, 2026

Mercedes-Benz extends Nvidia partnership for automated driving

Oct 16, 2026

Drought can disrupt food supplies far beyond affected farms

Oct 15, 2026

ManpowerGroup picks Becky Frankiewicz to lead its recovery

Oct 15, 2026

Euro area industrial output falls for a third month

Oct 15, 2026

GTCR and Elliott agree $6.1 billion takeover of insurance software group CCC

Oct 15, 2026

UK economy grows 0.1% in August, beating forecasts of a fall

Oct 15, 2026

TSMC forecasts another sales jump after profit rises 68.7%

Oct 15, 2026

EU e-waste collection remains far below its main target

Oct 14, 2026

IMF forecasts 3.1% growth with less room to absorb another shock

Oct 14, 2026

ASML weighs more capacity after a record €11.7 billion quarter

Oct 14, 2026

Buying robots does not always make factories more productive

Oct 13, 2026

Making electronics entirely in the US could raise costs by 41% to 152%

Oct 13, 2026

6G standards take shape while 5G investment continues

Oct 13, 2026

Five growth markets shaped by aging populations and infrastructure needs

Oct 13, 2026